Skip to content
Society

Theft of Track Fasteners Causes Wheel Derailment on Ismailia-Suez Train

News Egypt Editorial team · · Reading time 6min read · Views 0 ·
Key — The National Authority for Egyptian Railways reported a wheel derailment on November 12, 2026, involving train 107, with no injuries reported.

The National Authority for Egyptian Railways announced on November 12, 2026, that one wheel of the fourth carriage on train number 107, designated Tahya Egypt, derailed while traveling from Ismailia to Suez. This incident occurred in the distance situated between the Nafisha and Dabaia stations within the Ismailia Governorate. The Authority confirmed that the derailment did not result in any injuries among the passengers, nor did it cause any disruption to the overall operation of the railway network.

Incident Details and Chronology

The official statement from the National Authority for Egyptian Railways specified that the event took place at exactly 2:10 PM on November 12, 2026, while the train, which consists of five Tahya Egypt carriages, was in motion. Technical examinations conducted at the site revealed that the direct cause of the derailment was the theft of eight "bulangat," which are specialized components used for connecting and securing the railway tracks together. This loss of fastening equipment led to a loss of balance in the fourth carriage, causing it to leave the rails.

Following the discovery of the theft, the railway authority immediately took several measures to manage the situation and ensure passenger safety. These actions included separating the damaged fourth carriage from the rest of the train assembly. Furthermore, the train was allowed to complete its journey to its destination under normal conditions, while emergency teams and specialized cranes were dispatched to lift and realign the carriage and restore the track to its original state.

Official Responses and Safety Measures

Minister of Transport Kamel El-Wazir personally inspected the site of the derailment on November 12, 2026, which occurred on the bridge between the Nafisha and Dabaia stations. In response to the incident, the Minister issued strict instructions to the head and leadership of the National Authority for Egyptian Railways to implement a complete and total suspension of all train movements on the Ismailia-Suez line. This halt remains in effect until a comprehensive inspection of the entire railway track is finalized.

The Minister further directed the railway authority to deploy all its engineering teams across all lines throughout the Republic to conduct thorough and precise inspections of all railway tracks. These inspections aim to verify the integrity of the rails and the security of all fastening equipment to guarantee the highest levels of safety and operational regularity for all passengers. The railway authority is also coordinating closely with the Transport and Communications Police to intensify investigations and swiftly apprehend the individuals responsible for the theft.

This article was written with AI assistance from multiple news reports and is reviewed by our editors under our editorial principles. Editorial Standards · Tips & Contact

How did you like this post?

Comments 0

Be the first to comment

Contact us

← News Egypt Home
News Egypt Get new posts by emailSubscribe to receive new content via email. Unsubscribe anytime.
Was this helpful?Share it with friends & social